Number of Data Centers by State (2026)

Virginia has 685 data centers operating or planned, more than any other state, and Virginia, Texas and California together hold nearly a third of the U.S. total. Three States, One Third shows how few states hold most of the country's data centers, and the cards below show where the next wave is headed and what it does to state power grids.

Updated Nov 23, 20267 charts · 4 key stats4 primary sources
Fig. 1

Three States, One Third

States with the most data centers, operating and planned, Feb. 2026. Top bar: each group's share of the 4,624 U.S. data centers. Bottom bar: its share of the 50 states and D.C. Virginia, Texas and California are 6% of the map and hold 32% of the sites.

Share of U.S. data centers, operating and planned (4,624)32.1%41.1%26.8%Virginia685Texas466California331Next 12 statesOther 35 states and D.C.5.9%23.5%70.6%Share of the 50 states and D.C. (51)
  • Virginia, Texas, California · 3 states (5.9%)1,48232.1%
  • Next 12 states · 12 states (23.5%)1,90241.1%
  • Other 35 states and D.C. · 36 states (70.6%)1,24026.8%
  • Total · 51 states4,624100%

Data Center Map listings as of Feb. 19, 2026, published by Pew Research Center. Counts combine operating data centers with those under construction, planned or land banked; canceled and uncertain projects are excluded. Pew publishes only the top 15 states (ranked by this total) and four regional totals, so the national total (4,624) is hardware.co's sum of the regions, and the last group (1,240) is that total minus the 15 named states. Pew's October 2025 analysis also found "a third of U.S. data centers are in just three states."

Data centers in Virginia, operating and planned
685
398 operating and 287 planned; Texas is next with 466
Operating data centers in the U.S., Feb. 2026
3,068
Sum of Pew's four regions; Pew rounds it to "more than 3,000"
Data centers planned or under construction
1,556
67% of them in rural areas, vs. 13% of operating sites
Share of Virginia's electricity used by data centers, 2023
25.59%
About 4% nationally (EPRI estimate)
Fig. 2

Virginia runs more data centers than any other state

Operating data centers by state, Feb. 2026: the 15 states with the most data centers, operating and planned

Virginia398Texas296California277Ohio166New York148Illinois139Washington124Florida120Oregon115Arizona98Georgia94Pennsylvania78North Carolina72Iowa64Indiana38

Data Center Map via Pew Research Center, as of Feb. 19, 2026. Pew lists only the 15 states with the highest combined total, so a state with many operating sites but few planned ones could be missing from this ranking. Shares use hardware.co's national total of 3,068.

Fig. 3

Virginia also has the most data centers in the pipeline

Planned data centers by state (under construction, planned or land banked), Feb. 2026

Virginia287Texas170Georgia141Illinois123Arizona86Ohio57California54Indiana54Pennsylvania51North Carolina41Iowa41Oregon27Washington11Florida8New York6

Same 15 states as Fig. 2. Pew confirms the national top five: Virginia (287), Texas (170), Georgia (141), Illinois (123) and Arizona (86). Further down, states outside Pew's top 15 may have more planned sites than those shown. Georgia's 141 planned sites outnumber its 94 operating ones.

Fig. 4

Two-thirds of planned data centers are in rural areas

Where data centers are being built: share of U.S. data centers in rural and urban areas, by status, Feb. 2026

RuralUrban
0%25%50%75%100%Rural share: 13%–67%Currently operatingRural 13%Urban 87%PlannedRural 67%Urban 33%

Urban and rural categories follow the U.S. Census Bureau's classification. Pew also found that 39% of planned data centers are in counties that don't have one yet.

Fig. 5

The South holds nearly half of all planned data centers

Planned data centers by U.S. region, share of 1,556, Feb. 2026

48.5%26.9%17.8%
  • South75448.5%
  • Midwest41926.9%
  • West27717.8%
  • Northeast1066.8%
  • United States1,556100%

Census regions. The South's 754 planned sites would add 62% to its 1,209 operating ones and the Midwest's 419 would add 64%, against 34% in the West and 26% in the Northeast (Pew). The total and shares are hardware.co's arithmetic on Pew's regional counts; Pew puts the South at 48%.

Fig. 6

Per resident, Virginia has about five times the national rate

Data centers per capita by state: operating data centers per million residents, 2026

Virginia44.8Oregon26.9Iowa19.8Washington15.5Ohio13.9Arizona12.9Illinois10.9Texas9.3Georgia8.3New York7.4California7.0North Carolina6.4Pennsylvania6.0Indiana5.4Florida5.1U.S. average9.0

Derived by hardware.co: operating data centers (Data Center Map via Pew, Feb. 2026) divided by Census Bureau resident population on July 1, 2025. Covers only Pew's top 15 states; smaller states outside that list, such as Nebraska or Wyoming, are not ranked. The U.S. average uses the 3,068 national total.

Fig. 7

Data centers use a quarter of Virginia's electricity

Data center electricity use by state: share of total state electricity consumed, 2023, top 10 states

Virginia25.59%North Dakota15.42%Nebraska11.70%Iowa11.43%Oregon11.39%Wyoming11.26%Nevada8.69%Utah7.68%Arizona7.43%Washington5.69%United Statesabout 4%

EPRI estimates of 2023 data center load from Table A1 of Powering Intelligence. In energy terms Virginia's data centers used 33,851,122 MWh, ahead of Texas (21,813,159 MWh), which is only 4.59% of Texas's electricity. EPRI estimates 15 states held 80% of U.S. data center load. The national figure is EPRI's "about 4%" average estimate.

Free to republish

Add This Graphic to Your Website

Paste one snippet and every chart, stat and citation above appears on your page. It stays interactive and responsive, and it updates automatically when we revise the data.

  • All sources travel with every card
  • Resizes to fit any column width
  • Light or dark theme, full set or a single card
  • Free with attribution, which is built in
Share this graphic
<div class="graphic-embed" data-graphic="data-centers-by-state">
  <a href="https://hardware.co/graphics/data-centers-by-state">Number of Data Centers by State (2026)</a> by hardware.co
</div>
<script async src="https://hardware.co/embed.js"></script>
Auto-resizes to fit its content. Works on WordPress, Webflow, Squarespace, Ghost and plain HTML.
Preview

Which state has the most data centers?

Virginia has the most data centers of any U.S. state: 685, of which 398 are operating and 287 are planned or under construction, according to Pew Research Center's analysis of Data Center Map listings as of Feb. 19, 2026. Texas is second with 466 (296 operating) and California third with 331 (277 operating). Illinois (262), Georgia (235) and Ohio (223) round out the top six.

Virginia's lead has held across recent snapshots of the same database: Pew counted 643 Virginia data centers in October 2025 and 685 in February 2026.

How many data centers are in the U.S.?

The U.S. had 3,068 operating data centers in February 2026, with 1,556 more planned or under construction, according to hardware.co's sum of Pew's four regional totals (Pew describes them as "more than 3,000" and "more than 1,500"). That makes 4,624 in all.

Those sites are heavily concentrated. Virginia, Texas and California hold 1,482 of them, or 32%, while making up just three of 50 states plus D.C. The 15 states Pew names hold 3,384, or 73% of the national total, leaving 1,240 for the other 35 states and D.C. Figure 1, Three States, One Third, shows that imbalance as a funnel from share of states to share of sites.

Where are new data centers being built?

New data centers are being built mostly in rural areas of the South and Midwest: 67% of the 1,556 planned sites are in rural areas, compared with 13% of operating ones, Pew found. The South alone has 754 planned data centers, nearly half the national pipeline, and the Midwest has 419.

Virginia still has the biggest pipeline of any state (287), followed by Texas (170), Georgia (141), Illinois (123) and Arizona (86). In Georgia and Indiana, planned sites outnumber operating ones, so both states could more than double their data center count if every project is built. Pew also found that 39% of planned data centers are in counties that have none today.

Which states have the most data centers per person?

Among the 15 leading states, Virginia has by far the most data centers per person: 44.8 operating data centers per million residents, roughly five times the U.S. average of 9.0. Oregon (26.9) and Iowa (19.8) follow, both states with small populations. California, despite ranking third by count, has only 7.0 per million residents.

How much electricity do data centers use by state?

Data centers used 25.59% of Virginia's electricity in 2023, the highest share of any state, according to EPRI. That was 33,851,122 MWh, more than any other state. North Dakota (15.42%), Nebraska (11.70%), Iowa (11.43%), Oregon (11.39%) and Wyoming (11.26%) also devoted more than a tenth of their electricity to data centers, against about 4% nationally.

Texas used the second-most electricity for data centers (21,813,159 MWh), but its large grid kept the share to 4.59%. EPRI estimates that 15 states accounted for 80% of U.S. data center load in 2023, and 11 of them are also among the 15 states with the most data centers in Fig. 2.

Methodology & caveats

State and regional counts are Data Center Map listings as published by Pew Research Center (data as of Feb. 19, 2026). Pew combines data centers listed as under construction, planned or land banked into "planned" and drops canceled and uncertain projects. It publishes only the top 15 states (ranked by operating plus planned) and four Census regions. National totals (3,068 operating, 1,556 planned, 4,624 in all), the hero chart's tier sums and shares, regional shares and per-resident rates are hardware.co's arithmetic. The "other 35 states and D.C." group is a remainder, not a published figure. Because the top 15 is ranked by combined total, Figs. 2, 3 and 6 can miss states that rank high on one measure but not on the total.

Data Center Map relies largely on operators' own submissions, there is no federal registry, and each listing counts as one data center whether it is a small colocation room or a large hyperscale campus. Other trackers count differently and publish different totals. Pew's October 2025 snapshot covers all statuses but does not say whether canceled projects were removed, so the move from 643 to 685 in Virginia shows the direction of the count, not exact growth. The Visual Capitalist map that prompted this graphic also uses Data Center Map; its figures could not be checked against Data Center Map directly, whose site blocks automated access, so this graphic uses Pew's published analyses instead.

Electricity shares are EPRI estimates for 2023 (published May 2024), so they predate the 2026 counts. Per-resident rates divide Feb. 2026 operating counts by Census Bureau population estimates for July 1, 2025. No figure is adjusted or updated beyond what its publisher reports.

Sources

  1. [1]
    Pew Research Center. Most new data centers in the U.S. are coming to rural areas (Apr 13, 2026): analysis of Data Center Map data current as of Feb. 19, 2026https://www.pewresearch.org/short-reads/2026/04/13/most-new-data-centers-in-the-us-are-coming-to-rural-areas/
  2. [2]
    Pew Research Center. What we know about energy use at U.S. data centers amid the AI boom (Oct 24, 2025): "A third of U.S. data centers are in just three states: Virginia (643), Texas (395) and California (319)."https://www.pewresearch.org/short-reads/2025/10/24/what-we-know-about-energy-use-at-us-data-centers-amid-the-ai-boom/
  3. [3]
  4. [4]
    U.S. Census Bureau. Vintage 2025 population estimates: annual resident population for the U.S. and states, July 1, 2025 (NST-EST2025-ALLDATA)https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/state/totals/NST-EST2025-ALLDATA.csv
Cite this graphichardware.co. “Number of Data Centers by State (2026).” hardware.co Graphics, updated 2026-11-23. https://hardware.co/graphics/data-centers-by-state